barcelona.cat shortcuts

  • ajuntament.barcelona.cat
  • meet.barcelona
  • Info Barcelona
  • BCN guide
  • Procedures
  • BCN map
  • Communication channels
  • How to get there

English (Change language)

  • Català
  • Castellano
  • English
  • www.barcelona.cat
  • English
  • Logo Ajuntament de Barcelona
  • www.barcelona.cat
  • Ajuntament de Barcelona

barcelona.cat shortcuts

  • ajuntament.barcelona.cat
  • meet.barcelona
  • Info Barcelona
  • BCN guide
  • Procedures
  • BCN map
  • Communication channels
  • How to get there

English (Change language)

  • Català
  • Castellano
  • English
Skip to main content

Energia Barcelona

Home
Menu navigation instructions

Instructions for screen readers and keyboard users

This menu requires arrow keys to be able to use it. The menu has up to three levels:

  • First level: main menu options
  • Second level: sub-options for elements from the first level
  • Third level: sub-options for elements from the second level

Browsing instructions:

  • Browse using the horizontal arrow keys on the first level of the menu.
  • Display and browse on the second level using the vertical arrow keys.
  • Use the Escape key to get back to the first level.
  • Use the right arrow key to display the third level.
  • Browse the third level by using the vertical arrow keys.
  • Use the Escape key to get back to the second level.
  • Alternatively, use the Enter key to display any level.
  • Barcelona Energy
    Barcelona Energy
    • The Energy Observatory
    • Energy policies of the City Council
      • Energy policies of the City Council
      • Energy policies of the City Council
      • Programme to promote solar power generation
    • Barcelona Energy Agency
    • Understanding energy
    • Reference documents
  • Saving energy
    Saving energy
    • Saving energy in the home and in the workplace
      • Saving energy in the home and in the workplace
      • Saving energy in the home and in the workplace
      • Energy calculator
      • Rehabilitation to save
      • Promoting electric vehicles
    • The City Coouncil is saving
    • Heating and cooling networks
  • Generate energy
    Generate energy
    • Generate energy
      • Generate energy
      • Generate energy
      • Map: How much energy can you generate?
      • Grants and allowances
      • Sun4All Project
    • The City Council is generating
      • The City Council is generating
      • The City Council is generating
      • Map of energy generation in municipal buildings
  • Contract Energy
    Contract Energy
    • Contract Energy
      • Contract Energy
      • Contract Energy
      • Where can you find out all about them?
  • Activities and training
    Activities and training
    • More energy culture
      • More energy culture
      • More energy culture
      • Energy Week
  • Professional Area
    Professional Area
    • Professional Area
      • Professional Area
      • Professional Area
      • Solar Ordinance
      • Protocol and instruction
      • Solar integration
      • Guide for professionals
Menu navigation instructions

Instructions for keyboard users

This menu requires arrow keys to be able to use it. The menu has up to three levels:

  • First level: main menu options
  • Second level: sub-options for elements from the first level
  • Third level: sub-options for elements from the second level

Browsing instructions:

  • Browse using the vertical arrow keys on the first level of the menu.
  • Use the right arrow key to display the second level.
  • Browse on the second level using the vertical arrow keys.
  • Use the Escape key to get back to the first level.
  • Use the right arrow key to display the third level.
  • Browse the third level by using the vertical arrow keys.
  • Use the Escape key to get back to the second level.
  • Alternatively, use the Enter key to display any level.
  • Barcelona Energy
    Barcelona Energy
    • The Energy Observatory
    • Energy policies of the City Council
      • Energy policies of the City Council
      • Energy policies of the City Council
      • Programme to promote solar power generation
    • Barcelona Energy Agency
    • Understanding energy
    • Reference documents
  • Saving energy
    Saving energy
    • Saving energy in the home and in the workplace
      • Saving energy in the home and in the workplace
      • Saving energy in the home and in the workplace
      • Energy calculator
      • Rehabilitation to save
      • Promoting electric vehicles
    • The City Coouncil is saving
    • Heating and cooling networks
  • Generate energy
    Generate energy
    • Generate energy
      • Generate energy
      • Generate energy
      • Map: How much energy can you generate?
      • Grants and allowances
      • Sun4All Project
    • The City Council is generating
      • The City Council is generating
      • The City Council is generating
      • Map of energy generation in municipal buildings
  • Contract Energy
    Contract Energy
    • Contract Energy
      • Contract Energy
      • Contract Energy
      • Where can you find out all about them?
  • Activities and training
    Activities and training
    • More energy culture
      • More energy culture
      • More energy culture
      • Energy Week
  • Professional Area
    Professional Area
    • Professional Area
      • Professional Area
      • Professional Area
      • Solar Ordinance
      • Protocol and instruction
      • Solar integration
      • Guide for professionals
  1. Home
  2. / Saving energy

Heating and cooling networks

Barcelona has two centralised urban air-conditioning networks: the Llevant network, covering the Fòrum-22@ area, and the network covering the western Zona Franca and La Marina del Prat Vermell areas. The networks supply buildings with hot and cold water for central heating and air-conditioning and sanitary hot water.

Centralisation in production enables better energy efficiency in relation to individual solutions with boilers and air-conditioning equipment. Buildings that need to be supplied are connected to the supply station through a network of pipes carrying hot or cold water produced in the station.

Energy generation is carried out by making the most of waste energy resources, such as those from the El Besòs revaluation plant, or by exploiting the residual cold generated in the regasification process of liquefied natural gas in Barcelona Port.

The two existing heating and cooling networks are currently over 24 km long. Between them, they supply thermal energy totalling 105 GWh/year and the goal is to continue expanding them.

For further information:

  • Llevant Fòrum-22@ hot and cold network
  • Zona Franca-la Marina western cooling and heating networks

The system planned for La Sagrera Station and the surrounding area is still in the design stage. Work is also underway on a climate control micro-network for La Model.

Remote video URL
Don't you understand a concept? We help you
More related documentation
Barcelona City Council logo
  • Urban Planning, Ecological Transition, Urban Services and Housing
  • Legal notice
  • Accessibility